Critical equipment failures

cause lost production
Large operations have 5,000– 15,000 grease points
Neglecting 1 grease point can stop production

Recent Failure at QLD Mine

Main conveyor failed costing 43 hours of unplanned downtime
Root Cause was lack of grease on one grease point
Financial impact $34M in lost revenue + cost of repair and labour

GREASEBOSS ELIMINATES 99% OF THE RISK OF GREASE RELATED FAILURES

Provide visibility over planned vs actual greasing
activities to:

  • Pinpoint the source of greasing issues
  • Drive continuous improvement of site greasing activities
  • Maximise equipment efficiency and uptime
  • Reduce required skill level of greasers
  • Track and manage down grease consumption for economical and environmental benefits
  • Provide a new and unique data stream for predictive maintenance

WHAT IS GREASEBOSS?

VERIFY GREASE FLOW

RESERVOIR MANAGEMENT

USE CASE 1 - DRAGLINE GREASE BINS

USE CASE 2 - HME INJECTOR MONITORING

USE CASE 3 - PREVENT DRIVE SHAFT RELATED FIRES

USE CASE 4 - FIXED PLANT GREASING

KEY BENEFITS

  • Do more with less
    • Better service - limited resources
  • Provide higher level of service
    • Proactive servicing - awareness of issues as they
      arise, in real time
    • Lead the industry in digitising lubrication services
  • Improve operational efficiency
  • OPEX not CAPEX
      - Assets all managed by GreaseBoss
  • Reduced safety risk
    • Minimise time on the road
    • Eliminate climbing over equipment for inspections
  • Reduced contamination
  • Value add in service contract
    • Transparency with metrics
  • Vertically integrated services with consolidated supplier
    • All lubricant operational work handled under one contract
    • Central management of key digital delivery projects
  • Technology implementation
    • Data & insightful metrics
    • Expertise & scalability in technology implementation
  • OPEX not CAPEX
  • Eliminate safety risks
  • Track onsite hydrocarbon usage
    • Fuels and oils are currently tracked
    • GreaseBoss provides the capability to track grease consumption

GREASEBOSS WITH CASTROL CUSTOMERS

  • Dawson Mine
    • Dragline grease bin pilot (x8 Endpoints)
    • Site visit scheduled 14th March
  • Mackay Sugar
    • Grease bin pilot planned (x2 Endpoints)
    • High interest in full GreaseBoss system (ie. manual
      system and Endpoints)
    • System proposal ready to send via Castrol
  • BHP WAIO
    • Demonstrate system benefits leading into tender
  • Bowen Basin
    • Stanmore
    • Anglo American
  • Hunter Valley
  • Other opportunities?

THE FUTURE OF GREASEBOSS

Scroll to Top